top of page
RW

Temporary traffic lights on Stratford Road & extension to 25 November for completion of works


library image

There are temporary traffic lights controlling traffic on Stratford Road whilst SGN continues to replace gas mains in Stratford sub Castle.


The traffic lights are re-sited according to the location of the most-recent works and at present (21 October) restrict traffic on the bends near The Portway.





The estimated completion date has now been extended to 25 November.






The temporary traffic lights that had been in operation on Stratford Road controlling a section between Dairy Cottage and Mill Lane since 20 September were removed on

1 October.


On the section of Stratford Road that has been completed, it was necessary to disconnect the gas supply to some (but not all) properties for a few hours with the relevant householders being notified the previous day. If this should affect your property, once the supply is reconnected, a Gas-Safe Engineer will attend to check that boilers and other gas appliances are safe.

 

View SGN contact details below for queries or safety issues.


Information for Residents (Source: One Network)


  • We look after the gas network in the south of England and across Scotland. We’re here to keep you warm and make sure you’re safe all day, every day, for generations to come.


Contact SGN


  • If you’ve got any questions about our work in your area, please get in touch with us. If you have a safety concern about our equipment eg barriers, signs or cones, please call us on 0800 912 1700. Note added 21 August - to speak to SGN about a local isssue eg barriers blown down, choose option 6 to shortcut the very long recorded introductory message.



A post from the News page - view all News

 

Do you have something of local interest that could be added to the website? Articles, news stories or images are always welcome.

 

Please email details to sscvillagewebsite@gmail.com

bottom of page